

Online Brochure
O-Series PFAS Optimisation & Retrofit Consulting
The Challenge
Your PFAS Treatment Reality
Uncertain Costs
Are you paying too much for PFAS removal?
Hidden inefficiencies in current operations.
Unclear total cost of ownership.
Performance Gaps
Sub-optimal media utilisation.
Ineffective changeout strategies.
Regulatory compliance risks.
Limited Future-Proofing
Locked into outdated technology.
No clear upgrade pathway.
Tightening regulations ahead.
The O-Series provides clarity, optimisation, and a roadmap to regenerable Ion Exchange (IX) and advanced destruction.
Our Solution Framework
Evidence-Based Optimisation in Four Stages
BASELINE → UPGRADE PATH → RETROFIT → OPTIMISE
Know Your Costs: Benchmark current performance and identify immediate savings.
Design Your Future: Feasibility and business case for regenerable systems.
Execute Retrofit: Full design pack and implementation support.
Continuous Improvement: Ongoing performance monitoring and cost control.
Flexible entry points - start where you are, move at your pace.


O-Series Tier 1 - Foundation & Quick Wins
Understand Your Baseline, Capture Immediate Value
O0.1 & 0.2 - Existing PFAS Capture Triage Call
Duration: 30-45 minutes.
Deliverable: Indicative savings and recommended next step.
Value: Often free for target accounts; otherwise, £0-£500 (creditable).
O1 - PFAS Capture Cost Benchmark & Quick Wins
What You Get:
Baseline cost model vs best-practice IX/regenerable IX.
Contracts, invoices, and system design review.
"No-regret" operational improvements identified.
6–10-page memo + 60-min results call.
Investment: Contact us for pricing.
Typical ROI: Payback in months through optimized changeout frequency and vendor renegotiation.
Key acronym clarifications: IX = Ion Exchange; PFAS = Per- and Polyfluoroalkyl Substances.
O-Series Tier 2 - Strategic Upgrade Path
O2 - PFAS toolbox - Treatment Upgrade Feasibility
The Opportunity: Move from single-use media and disposal to regeneration and achieve 50-80% cost reduction.
What You Receive:
Process review (hydraulics, vessels, footprint) – on-site or virtual.
Possible upgrade scenarios:
-GAC (Granular Activated Carbon) → regenerable IX.
-Polish IX after RO/NF (Reverse Osmosis/Nanofiltration).
-EboNext (Advanced Electrochemical Oxidation) pre-treatment where applicable.
-Foam fractionation after 'conditioning' pass
-Upgrade to PFAS specific capture media
CAPEX (Capital Expenditure)/OPEX (Operating Expenditure) ranges, payback analysis, NPV (Net Present Value).
Compliance implications and risk assessment.
15–25-page feasibility report + stakeholder workshop.
Investment: Contact us for pricing (part-creditable against O3).
Business Case Support: Board-ready financial models and regulatory compliance roadmap.
O-Series Tier 3 - Implementation & Delivery
O3 - PFAS Capture Retrofit & Regeneration Design Pack
From Concept to Construction-Ready
Detailed Engineering Deliverables:
IX retrofit design with regenerant handling and regeneration loops.
Sizing of all equipment: cycle volumes, distillation duty, waste routing.
"Before vs after" lifecycle cost model with sensitivities.
Inputs to RFQs (Requests for Quotation)/tenders and board-ready business case.
Investment: Contact us for pricing.
Risk Mitigation:
De-risked procurement process.
Vendor-neutral specifications.
Performance guarantees framework.
Outcome: Deployable retrofit with clear ROI and compliance pathway.
O-Series Tier 4 - Continuous Optimisation
O4 - PFAS Capture Performance Optimisation & Cost Monitoring
Ongoing Assurance & Value Protection
What's Included:
Periodic performance and cost reviews (single or multi-site).
Operating window tuning and regeneration strategy optimisation.
Live dashboards for operators and management.
Support for re-bids and regulatory submissions.
Flexible Retainer Options:
Light: Contact us for pricing – quarterly reviews.
Standard: Contact us for pricing – monthly optimisation.
Strategic: Contact us for pricing – multi-site program management.
Value Delivery:
Sustained cost reduction.
Regulatory compliance confidence.
Performance bench-marking across portfolio.
Early warning of system degradation.
Specialist Modules & Choosing Your Entry Point
Specialist Modules:
O-M1 – Media Benchmark & RSSCT (Rapid Small-Scale Column Testing) Package
Investment: Contact us for pricing.
Small-scale testing of current vs candidate IX media.
O-M2 – Analytics & Changeout Strategy
Investment: Contact us for pricing.
Align PFAS analytics with robust changeout rules.
O-M3 – Destruction Route Optimisation
Investment: Contact us for pricing.
Compare incineration vs EboNext - AEOP (Advanced Electrochemical Oxidation Process) for PFAS-rich streams.
O-M4 – Commercial & Contract Optimisation
Investment: Contact us for pricing.
Re-design vendor contracts around verified mass of PFAS removed.


Where Are You Now?
Choose Your Starting Point:
Already treating PFAS but unsure of true cost →
Know costs are high; considering upgrade options →
Committed to upgrading to regenerable IX or new trains →
Running upgraded systems and want continuous optimisation →
All paths are creditable – Investment in earlier tiers credited against later stages.
Why 2Encapsulate
Technical Expertise Meets Commercial Pragmatism
Regulatory fluency: We speak the language of Environment Agency/SEPA/NRW and translate it into actionable strategy.
Process-neutral advice: No tied contractors, no hidden commissions—only recommendations that serve your interests.
Speed to value: Methodologies proven across industrial, chemical, pharmaceutical and waste sectors.
End-to-end accountability: From sampling to commissioning, one team owns your success.
Next Steps
Let's Start the Conversation
Three-step engagement:
Book Your Triage Call – 30 minutes to understand your situation (O0.1).
Receive Your Roadmap – We'll recommend the right O-Series entry point.
Begin Optimisation – Quick wins now, strategic upgrades ahead.
Acronyms clarified
PFAS (Per- and polyfluoroalkyl substances)
DWI (Drinking Water Inspectorate)
EA (Environment Agency)
CAPEX (Capital Expenditure)
OPEX (Operational Expenditure)
PFD (Process Flow Diagram)
P&ID (Piping and Instrumentation Diagram)
IX (Ion Exchange)
AEOP (Advanced Electrochemical Oxidation Process)
GAC (Granular Activated Carbon)
ESA (Environmental Site Assessment)


Take Action
Address
London, United Kingdom
Contact


Copyright © 2026 2Encapsulate Limited. All rights reserved.
